OPSMITH CONSTRUCTION REFERENCE PACK — version 1.0, 2026-10-28 Project RIV-026: Rivergate Unit 4 retrofit. Worked example data. All people, businesses, amounts, dates, events and decisions are part of the worked example. No file is evidence of an actual project, insurance policy, WCB clearance or authorization. Photo references are placeholders: no site photos or audio files are included. Start here: 1. Open field-inputs.json and compare the note with the roster. 2. Read daily-report-completed.txt to see the reviewed result and unresolved facts. 3. Compare CR-007 v2 and v3 in change-register.csv; use the decision-packet template. 4. Review the company-name mismatch and recheck dates in subcontractor-document-register.csv. 5. Run the reference validator and compare results with the labelled test cases. Files and roles: field-inputs.json — example source events and labelled test cases. validate-field-submission.mjs — small deterministic reference validator, no dependencies or network calls. daily-report-completed.txt — completed review example, not an automatically approved report. daily-report-template.csv — blank field register for adapting your own daily-report requirements. change-register.csv — example change versions and separate administrative states. change-decision-packet-template.txt — reusable review packet structure. subcontractor-document-register.csv — example requirement/receipt/review/renewal records. workflow-acceptance-tests.csv — end-to-end test scenarios and expected behavior. model-evaluation-scorecard.csv — blank measurement sheet; no model benchmark results claimed. Run the included deterministic checks with Node.js: node validate-field-submission.mjs field-inputs.json Expected labelled outcomes: clean=ready_for_review; arithmetic_conflict=review; missing_project=hold; repeated_event=duplicate; missing_photo=review; invalid_date=hold; missing_roster=hold; invalid_hours=hold; changed_material=review; late_upload=ready_for_review. Ready for review is not approved for issue, payment or work. The validator only checks the teaching fields; it does not validate real dates against a project calendar, inspect files, decide contractual authority, verify insurance/WCB status or provide production security. Its seen-event list is supplied by the caller. Production duplicate protection needs durable, atomic source-event and destination records, access controls and a tested recovery process. CSV files contain no formulas. Import dates and identifiers as text when appropriate. Use the blank structures only after adapting requirements with the responsible project roles. These materials can be adapted for internal business use with attribution to OpSmith. Source guide: https://opsmith.ca/resources/construction-workflow-automation