BP-101 - Worked Operational AI Blueprint example Version: 1.1 - November 4, 2026 (original example November 3, 2026) All businesses, volumes, timings and decisions in this file are illustrative. This is not a customer case, measured pilot result, project quote or service agreement. DECISION Pilot preparation of source-linked draft quote requests only after customer-matching rules and test access are approved. Keep unresolved gates visible; no production release has been authorized. BOUNDARY Trigger: an eligible quote request arrives in one approved shared inbox. Output: one coordinator-reviewed draft request and an owned estimating handoff. Systems: approved inbox, customer reference source, draft-intake destination. Human decisions: ambiguous identity, missing facts, intake acceptance and commercial promises. Excluded: pricing engine, customer-facing visualizer, automatic quote release, CRM migration, inventory and delivery promises. BASELINE ASSUMPTIONS 100 eligible requests per month x 12 active coordinator minutes = 20 hours per month. Pilot target: 4 remaining minutes per eligible request. Scenario difference: 800 minutes or approximately 13.3 hours per month before operating and maintenance effort. Observation period, actual sample, exceptions and model results: not supplied; collect before claiming a measured benefit. Released capacity is not assumed to be payroll savings. Separate sensitivity: at an assumed CAD 40/hour, 800 minutes is approximately CAD 533/month of gross capacity value before operating effort. Actual build and operating quotes are unavailable, so no payback or justified investment is established. Narrow the scope, use existing features or stop if supported benefits do not justify cost. CURRENT PROCESS Receive email and preserve attachments. Find the customer; resolve shared or conflicting identities. Copy requested items and identify missing facts. Prepare and review intake; clarify unknowns. Transfer accepted scope to an estimating owner. PROPOSED PILOT Preserve message identity and original evidence. Prepare only source-supported fields; retain unknowns. Route ambiguous records to the coordinator. Create or update a draft only within the approved permission boundary. Verify the destination and ownership; retain uncertainty after a lost acknowledgement. OPEN DEPENDENCIES Business owner: confirm eligible request type and matching rules. System owners: authorize the named task in a suitable test environment. Coordinator: review representative normal and exceptional records. Release owner: agree acceptance thresholds, critical failure rules and recovery authority. Finance or responsible owner: confirm actual build and operating quotes; no price is established by this example. ACCEPTANCE See blueprint-acceptance-register.csv. Actual outputs are unrun. An aggregate pass rate cannot authorize an unapproved customer promise or duplicate irreversible action. ALTERNATIVES If volume is insufficient, simplify the intake instructions before building. If identifiers or destination evidence are unavailable, narrow the output or resolve the dependency first. If the same need can be met by a reliable existing feature, compare that option before commissioning custom work. NEXT DECISION Approve the bounded pilot only after the named dependencies are resolved and its separate commercial scope is accepted. OBSERVATION PLAN TO REPLACE THE ASSUMPTIONS Choose and record a defined observation window and eligible request population. Record active intake handling, waiting, returns, rework and exceptions separately. Include difficult and abandoned records; preserve exclusions and source references. Count review and exception work consistently in both current and pilot intake time. Estimate maintenance and other operating effort separately. Actual observation dates, sample size, measured timings and pilot results: not supplied. READOUT AND IMPLEMENTATION HANDOFF Decision status: conditional pilot recommendation; no build or live release authorized. Each open dependency above needs a named organizational owner and agreed due date. Build and operating quotes remain unresolved; the 13.3-hour scenario is not savings evidence. Confirm accepted scope, deliverable rights and any further technical discovery with the chosen implementation team. This example establishes no contract or ownership terms.